top of page

Traditional Install Method
For those who wish for a permanent, tried and true concrete resurface
Service time: 3-5 Business Days
​
1. CONCRETE PREPARATION
Perform moisture test on substrate to insure adhesion. Perform hardness test to ensure proper abrasion is done. Ensure pitch and slope of current surface is level. Mechanically prepare
(grinding) the surface to accept the coatings and ensure proper adhesion.
​
2. CLEAN THE SURFACE
Remove all dust and debris from concrete ensuring the use of OSHA approved HEPA systems for dust collection before coating begins.
​
3. CRACK & PIT REPAIR
Repair any cracks or pits in the concrete.
​
4. RE-CLEAN THE SURFACE
After repairs are complete, remove any debris remaining.
​
4. PREPARE THE COATINGS FOR YOUR FLOOR
​
5. COAT VERTICALS AND STAIRS
​
6. APPLY POLYASPARTIC BASECOAT
​
7. BROADCAST ADDITIVES
​
8. REMOVE EXCESS & SCRAPE SMOOTH AS POSSIBLE WHEN NECESSARY
​
9. VACUUM ENTIRE FLOOR TWICE FOR REMOVAL OF EXCESS MATERIALS
​
10. APPLY CLEAR POLYASPARTIC TOPCOAT
bottom of page